更新时间:2020-09-25 11:21:30
封面
版权信息
中华人民共和国住房和城乡建设部公告
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General
2 Terms
3 Basic Requirements
4 Heating(Cooling)and Electrical Load
4.1 Heating(Cooling)Load and Heating(Cooling)Medium
4.2 Electrical Load
5 Siting
6 Overall Planning
6.1 General Requirements
6.2 Planning of Plant Area
6.3 Off-site Planning
7 Main Power Building Arrangement
7.1 General Requirements
7.2 Main Power Building Arrangement
7.3 Maintenance and Repair Facilities
7.4 Integrated Facilities
8 Coal Handling System
8.1 General Requirements
8.2 Coal Unloading Facilities and Off-site Transportation
8.3 Belt Conveyor System
8.4 Coal Yard and Relevant Facilities
8.5 Screen and Coal Crusher
8.6 Limestone Storage and Pulverizing System
8.7 Coal Handling Control Mode
8.8 Coal Handling Auxiliary Facilities and Ancillary Buildings
9 Boiler Equipment and System
9.1 Boiler Equipment
9.2 Coal Pulverizing System
9.3 Flue Gas and Air System
9.4 Ignition and Combustion Supporting Oil System
9.5 Boiler Auxiliary System and Associated Equipment
9.6 Startup Boiler
10 Ash Handling System
10.1 General Requirements
10.2 Hydraulic Ash Handling System
10.3 Mechanical Bottom Ash Handling System
10.4 Dry Fly Ash Handling System
10.5 Off-site Ash Transportation System
10.6 Control and Maintenance Facilities
10.7 Ash Handling System for CFB Boiler
11 Flue Gas Desulfurization System
12 DeNOx System
13 Steam Turbine Equipment and System
13.1 Steam Turbine Equipment
13.2 Main Steam System and Heat Supplying Steam System
13.3 Feedwater System and Feedwater Pump
13.4 Deaerator and Feedwater Tank
13.5 Condensate System and Condensate Pump
13.6 Drain Pump of Low-pressure Heater
13.7 Drain Flash Tank,Drain Tank,Drain Pump,Low-level Water Tank,and Low-level Water Pump
13.8 Service Water System
13.9 District Heating System Heater and System
13.10 Temperature and Pressure Reducing Devices
13.11 Condensate Recovery Device for Steam Network
13.12 Condenser and Its Auxiliary Facilities
14 Water Treatment Equipment and System
14.1 Water Pretreatment System
14.2 Water Pre-desalination System
14.3 Boiler Makeup Water Treatment System
14.4 Chemical Dosing and Water-Steam Sampling of Thermodynamic System
14.5 Cooling Water Treatment
14.6 Water Treatment System for District Heating System Makeup Water and Industrial Return Water
14.7 Chemicals Storage and Solution Tank
14.8 Design and Anticorrosion of Tanks,Channels,Pipes,and Valves
14.9 Chemical Laboratory and Instruments
15 Information System
15.1 General Requirements
15.2 Overall Planning of Plant Information System
15.3 Management Information System
15.4 Price Bidding System
15.5 Video Monitoring System
15.6 Access Guard Management System
15.7 Cabling
15.8 Information Security
16 Instrumentation and Control
16.1 General Requirements
16.2 Control Mode and Automation Level
16.3 Arrangement of Control Room and Electrical Equipment Room
16.4 Measurement and Instrumentation
16.5 Modulating Control
16.6 On-off Control and Interlocking
16.7 Alarm
16.8 Protection
16.9 Control System
16.10 Control Power Supply
16.11 Arrangement of Cables,Instrument Conduits,and Local Equipment
16.12 Instrumentation and Control Laboratory
17 Electrical Equipment and System
17.1 Generator and Main Transformer
17.2 Main Electrical Connection
17.3 AC Auxiliary Power System
17.4 HV Switchgears
17.5 DC Power Supply System and AC UPS
17.6 Electrical Supervisory and Control
17.7 Electrical Measuring Devices