更新时间:2020-09-24 18:23:51
封面
版权页
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provision
2 Terms
3 Basic Requirement
4 Mineral Processing Experiments
4.1 Representativeness of Samples
4.2 Mineral Processing Experiments
5 Scale,Working System and Availability of Equipment
5.1 Scale
5.2 Working System and Availability of Equipment
6 Plant Siting
7 Technology Process
7.1 General Requirement
7.2 Crushing and Screening Flow Sheet
7.3 Grinding and Classification Flow Sheet
7.4 Separating Flow
7.5 Dewatering Separation
8 Selection of Main Equipment
8.1 General Requirements
8.2 Crushing and Screening Equipment
8.3 Grinding and Classification Equipment
8.4 Separating Equipments
8.5 Dehydrate Equipment
9 Workshop Layout and Workshop Equipment Collocation
9.1 Workshop Layout
9.2 Workshop Equipment Collocation
10 Establishment of Mine Storing
11 Establishment of Auxiliary Production
11.1 Feeding,Discharging and Material Handling Facilities
11.2 Maintenance and Repair Facilities
11.3 Reagent Facilities
11.4 Autocontrol,Checking and Measure
11.5 Test and Assay Laboratories
12 Comprehensive Utilization
12.1 Principle of Comprehensive Utilization
12.2 Examination of Comprehensive Utilization
13 Safety and Environmental Protection
13.1 Labor Safety
13.2 Industrial Health
13.3 Environmental Protection
Explanation of Wording in This Code
Explanation of provisions
Explanation of development