Foreword
According to the requirements of-Notice on Printing and Distribution of<the Code Preparation and Revision Plan of the National Engineering Construction Standards in 2007(Second Batch)>(Construction Standard(2007)No.126)issued by former Ministry of Construction(MOC),it has been jointly developed by Northern Engineering & Technology Corporation,MCC and Zhongye Changtian International Engineering Co.,Ltd.in conjunction with other organization concerned.
The code comprises 13 chapters with the main technical contents including general,terms,basic requirement,mineral processing experiments,scale,working system and availability of equipment,plant siting,technological process,selection of main equipment,workshop layout and equipment collocation,establishment of mine storing,establishment of auxiliary production,comprehensive utilization,safety and environmental protection.
The provisions as marked in bold letters in this code are compulsory and must be enforced strictly.
Housing and Urban-Rural Development Ministry of the People's Republic of China is in charge of the management of this code and the explanation of the compulsory provisions.China Metallurgical Construction Association is responsible for the routine management.Northern Engineering & Technology Corporation,MCC and Zhongye Changtian International Engineering Co.,Ltd.are responsible for the explanation of specific technical contents.All relevant organizations are kindly requested to conclude the experience and accumulate information in great attention during the implementation process of this code.and the opinions and relevant data will be sent in time to Northern Engineering & Technology Corporation,MCC(Management Team of National Standard Code for Technological Design of Metallurgical Concentrator,Address:No.35 Shengli Nan Road,Anshan,Liaoning,P.R of China,Postal code:114009)for reference in the future revisions.
Chief Development Organizations,Participating Development Organizations,Chief Drafting Staff and Chief Reviewers of this code:
Chief Development Organizations:
Northern Engineering & Technology Corporation,MCC
Zhongye Changtian International Engineering Co.,Ltd.
Participating Development Organizations:
Northeastern University
Gongcangling Mining company,ANSTEEL MINING
Qidashan Iron Mining company,ANSTEEL MINING
Mining Branch Company,Taiyuan Iron & Steel(Group)Co.,Ltd.
Baosteel Shanghai Meishan Mining Co.concentration plant
Shenyang Heavy Machinery Group Co.,Ltd.
Shenyang Mining Group
Conveying Equipment Branch,NHI Shenyang Mining Machinery Co.,Ltd.
Jiangsu Universal Machinery Equipment Co.,LTD
Fushun LONGI Electromagnetic Technology Co.,LTD
Chief Drafting Staff:
Xiao Qingbo Wang Litian Yang Wengzhang Wu Gexiong Gong Xiangtao
Ma Jinqian Zhang Guanglie Wei Dezhou Quan Yongchang Wang Jiantao
Zhang Haiying Yang Hailong Zeng Ye Zhang Guoqing Chen Bin
Sun Baoli Zhang Tingdong Hu Zhen Ouyang Shuzhao Liu Haihong
Zhou Yulian Chen Mensheng Zhou Wei Wang Yingzi Liu Anping
Feng Jingchan Ni Riliang Wang Yu Zhang Jianping Zhao Nengping
Sun Yanguo Jin Fengmin
Chief Reviewers:
Zhu Jujian Tian Jiayin Wei Bingtuan Yang Zaoqi Yu Baoqian
Zhu Xiaochun Wang Chengliang