GB50612-2010冶金矿山选矿厂工艺设计规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

5.2 Working System and Availability of Equipment

5.2.1 The working system of concentrator plant shall be of continuous working.

5.2.2 The main workshop working system and availability of main equipment shall be in accordance with those specified in Table 5.2.2.

Table 5.2.2 Table of main workshop working system and availability of main equipment

img