更新时间:2020-09-25 11:20:00
封面
版权信息
Announcement of Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 Basic Provisions
4 Hot Metal Pretreatment
4.1 Process Design
4.2 Powder
4.3 Process Equipment
4.4 Process Layout
5 Converter Steelmaking
5.1 General Process Design
5.2 Material Preparation and Supply
5.3 Process Equipment
5.4 Layout of Converter Steelmaking Shop
6 EAF Steelmaking
6.1 Process Design
6.2 Material Preparation and Supply
6.3 Process Equipment
6.4 Layout and Building of EAF Steelmaking Shop
7 Secondary Refining
7.1 Process Design
7.2 Material Preparation and Supply
7.3 Process Equipment
7.4 Process Layo ut
8 Slag Treatment
8.1 General Process Design
8.2 Converter Slag
8.3 EAF Slag
8.4 Slag from Refining and Residual Scrap from Casting
8.5 Slag from Hot Metal Pretreatment
8.6 Stainless Steel Slag
8.7 Process Equipment
8.8 Process Layout
9 Mechanical Repair and Laboratory
9.1 Mechanical Repair
9.2 Laboratory
10 Electrical Power
10.1 Load Classification and Power Supply
10.2 Power Supply and Distribution System
10.3 Reactive Power Compensation and Quality of Power Supply
10.4 (Distribution)Substation and Electrical Room
10.5 Power Supply and Distribution Facility and Electrical Drive
10.6 Power Engineering
11 Instrumentation
11.1 Selection and Design of Instrument
11.2 Measuring and Control Item
11.3 Power Source of Instrument
11.4 Instrument Protection and Safety
12 Telecommunication
13 Automation Control and Information-based Technology
13.1 General Provisions
13.2 Basic Automation
13.3 Process Control
13.4 Information-based Technology
14 Water Supply and Drainage
14.1 General Provisions
14.2 Water Quality and Requirement for Steelmaking Process
14.3 Water Supply System
14.4 Water Treatment Facility
14.5 Emergency Water Supply
14.6 Water Quality Stabilization
14.7 Makeup Water
14.8 Water Quality Analysis and Monitoring
15 Thermal Power
15.1 General Provisions
15.2 Waste Heat Boiler System for Converter
15.3 Waste Heat Boiler System for EAF
15.4 Thermal Power Facility for Secondary Refining
15.5 Steam Supply
15.6 Compressed Air Supply
16 Heating,Ventilation and Air Conditioning and Dedusting
16.1 General Provisions
16.2 Heating
16.3 Ventilation
16.4 Air Conditioning
16.5 Dedusting
17 Fuel and Gas
17.1 General Provisions
17.2 Converter Gas Cleaning and Recovery System
17.3 Gas Valve Station and Pipe Network
18 Building and Structure
18.1 General Provisions
18.2 Main Shop Building
18.3 Equipment Foundation
18.4 Process Platform
18.5 Building for Utility
19 General Layout and Material Transportation
19.1 Selection of Plant Site
19.2 Layout of Plant Area
19.3 Transportation
19.4 Greening
20 Safety and Environment Protection
20.1 Safety
20.2 Fire Protection
20.3 Environment Protection and Comprehensive Utilization
21 Energy Conservation
22 Engineering Pricing and Project Investment Consulting