5 Equipment and Materials in Site

5.1 General Requirement

5.1.1 Hoisting points shall be in the identified places of equipments and packages with protections when equipments are transported and hoisted.Equipments shall not be damaged by transportation and hoisting.

5.1.2 Open-package inspections shall be conducted and recorded before equipment installations.Equipments shall be paid attention to protections and installed timely after open-package inspections.

5.1.3 Materials in site shall be neatly stacked in specification with damage preventions.