更新时间:2020-09-24 18:13:53
封面
版权页
Announcement of the Ministry of Housing and Urban-Rural Development of the People's Republic of China
Foreword
1 General Provisions
2 Terms
3 General Principle for Design of Continuous Casting Engineering
4 Process Design of Continuous Casting Workshop
4.1 General Requirement
4.2 Match of Steelmaking Furnace and Continuous Casting Machine
4.3 Productivity of Workshop
4.4 Layout and Building of Continuous Casting Workshop
5 Choice of Technology Parameter and Type of Continuous Casting Machine
5.1 Choice of Strand Section
5.2 Arc Radius
5.3 Casting Speed
5.4 Metallurgical Length
5.5 Number of Strands
5.6 Choice of Type
6 Equipment of Continuous Casting Machine
6.1 General Requirement
6.2 Transporting and Casting Equipment for Ladle
6.3 Tundish Car
6.4 Tundish
6.5 Mould
6.6 Mould Oscillation
6.7 Secondary Cooling and Strand Guide Equipment
6.8 Withdrawal Unit or Drive of Segment
6.9 Strand Cutting Equipment
6.10 Roller Table
6.11 Dummy Bar and its Receiver
6.12 Strand Cooling and Transporting Equipment
6.13 Hydraulic,Pneumatic and Lubrication System
7 Electric,Instrumentation and Automation
7.1 Power Supply
7.2 Drive
7.3 Instrumentation
7.4 Telecom
7.5 Automation
7.6 Electric
8 Water Treatment System
8.1 General Requirement
8.2 Required Water Quality and Parameter
8.3 Water Supply System
8.4 Main Equipment of Water Treatment
8.5 Safety Water
8.6 Water Stability
8.7 Supplementary Water
8.8 Analysis and Monitoring of Water Quality
8.9 Layout of Water Treatment
Explanation of Wording in This Code
List of Quoted Standards
Explanation of Provisions
Description of Code Preparation
4.2 Match of Steelmarking Furnance and Continuous Casting Machine
4.3 Productivity of workshop
5 Choice of Technology Parameter and Type of Continous Casting Machine
6 Equipment of Continuous Caster Machine
8.6 Water Stablity