4.6 Project Acceptance

4.6.1 For the quality acceptance for waste heat boiler project installation,the main control items of test batches shall include the following contents:

1 Boiler foundation positioning;

2 Boiler steel frame assembly and installation;

3 Installation for boiler proper doors and holes,part of sealing elements;

4 Installation of ash hopper and dust collection device;

5 Installation of drum and header;

6 Installation of heating surface(economizer,evaporator,superheater);

7 Installation of de-ashing device;

8 Pressure test for the entire boiler.

4.6.2 The issued certificates for boiler installation shall include the following contents:

1 Records and certificate for concealed project construction;

2 Certificate for ball passing test for heating surface tubes;

3 Qualified certificate for boiler pressure test;

4 Completion certificate for de-ashing rapping system and tests;

5 Certificate for steam tightness test.

4.6.3 While carrying out acceptance for waste heat boiler installation,the following documentation are required to be submitted:

1 Record for equipment open-package inspection;

2 Reviewing record for alloy steel pipelines and pipe fittings;

3 Reviewing record for boiler foundation;

4 Record for boiler steel frame assembly and installation;

5 Record for economizer assembly and installation;

6 Record for evaporator assembly and installation;

7 Record for superheater assembly and installation;

8 Record for drum installation;

9 Checking record for installation of drum internal devices;

10 Installation record for main hot expansion displacement components;

11 Checking record for heat expansion clearance of heating surface;

12 Checking record for safety valve checking;

13 Report for nondestructive inspection for boiler proper welding;

14 Boiler installation supervision and inspection certificate;

15 Acceptance record for subdivisional work;

16 Effective technical documentation list and original documentation for design alternation and substitute materials;

17 The certificates required by Article 4.6.2 of this code;

18 Other required documentation and records.