YD/T5132-2005移动通信工程钢塔桅结构验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

6 Processing Work of Steel Parts and Components

6.1 General Requirements

6.1.1 This chapter is applicable to the acceptance of processing quality of steel parts and components,performed during the fabrication or installation of steel tower and mast structure.

6.1.2 The processing work of steel parts and components may be divided to one or several inspection lots according to the basis of process arrangement and process differences.