GB50386-2016轧机机械设备工程安装验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

7.2 Coiler

General item

7.2.1 Radial displacement of two axle centers,inclination of two axial lines and end clearances during coupling assembling shall meet the requirements of design documents.If there is no requirement from the design,it shall meet the requirements of current national standard,i.e.,General code for construction and acceptance of mechanical equipment installation engineering GB 50231.

Inspection quantity:total number inspection.

Inspection method:check the assembling record and inspect with dial indicator and feeler gauge.

7.2.2 Clearance between the moveable coiler main body and the base plate slide rail shall meet the requirements of design documents.

Inspection quantity:30% sampling inspection and not less than 1 set.

Inspection method:check installation quality record and inspect with feeler gauge.

7.2.3 The backlash,tip clearance,gear engagement contact area,axial drifting of the exposed gear drive and reducer during the assembling of reducer with gear seat shall meet the requirements of design documents.If there is no requirement from the design,it shall meet the requirements of current national standard,i.e.,General code for construction and acceptance of mechanical equipment installation engineering GB 50231.Each part of reducer and gear seat shall be sealed well.

Inspection quantity:30% sampling inspection and not less than 1 set.

Inspection method:check the installation and quality record;inspect with coloring,pressing lead wire,micrometer gauge and feeler gauge.

7.2.4 The allowable installation deviation of cold rolling strip coiler shall be in accordance with those specified in table 7.2.4.

Inspection quantity:total number inspection.

Inspection method:it should be in accordance with those specified in table 7.2.4.

Table 7.2.4 Allowable installation deviation of cold rolling strip coiler

img

7.2.5 The allowable installation deviation of cold rolling rotary type double-drum coiler shall be in accordance with those specified in table 7.2.5.

Inspection quantity:total number inspection.

Inspection method:it should be in accordance with those specified in table 7.2.5.

Table 7.2.5 Allowable installation deviation of cold rolling rotary type double-drum coiler

img

7.2.6 The allowable installation deviation of hot rolling strip coiler shall be in accordance with those specified in table 7.2.6.

Inspection quantity:total number inspection.

Inspection method:it should be in accordance with those specified in table 7.2.6.

Table 7.2.6 Allowable installation deviation of hot rolling strip coiler

img

Table 7.2.6(Continued)

img

7.2.7 The levelness of coiler shall be the reel cantilever end higher than the drive end;The verticality of coiler relative to mechanical unit centerline shall keep the reel cantilever end and the discharge direction divergent.