上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人
4 Control Room Building
4.1 General Requirements
4.1.1 Design of control room buildings shall comply with occupational health,safety and environmental protection requirements.And control room buildings for petrochemical process plants with potential explosion hazards shall be designed in compliance with SH/T 3160.
4.1.2 Control room buildings shall be designed and constructed according to the capacities,features,management requirements and operation modes of the petrochemical plants.