GB51104-2015取向硅钢生产线设备安装与验收规范(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

5 Shearing Equipment

5.1 Installation of Notcher

5.1.1 When adjusting the elevation,the surface of lower cutter table should be taken as the datum point.

5.1.2 When adjusting the longitudinal and lateral central lines,the central line of machine frame should be taken as the datum point.

5.1.3 When adjusting the levelness,the surface of movable guide rail should be taken as the datum point.

5.1.4 When adjusting the verticality,the machine frame surface of fixed shear should be taken as the datum point.