6.3 Vertical Layout

6.3.1 The flood control system of the surface facilities shall have capacity to remove water from a flood of a no less than 50-year frequency.

6.3.2 If the cavern storage is close to a river or lake etc.,its site's minimum design elevation shall be 0.5m higher than the calculated flood level;if it is located in an island,a coastal area,or a river mouth area with significant tidal actions,the minimum design elevation of its surface facilities shall be 1m higher than the calculated water table;in an unsheltered coastal area,the maximum height of waves above the static water surface shall be considered.The calculated water table shall be the tidal level whose high-tide accumulative frequency is 10%.