11 Installation of Vacuum Ladle Refining Furnace and Vacuum Oxygen Decarburization Converter

11.1 General Requirements

11.1.1 The track for vacuum tank car shall be installed according to the requirement of Section 10.1 of the code.

11.1.2 The vacuum tank car shall be installed according to the requirement of Section 10.2 of the code.