This code was jointly prepared by Northern Engineering and Technology Corporation,MCC and other companies according to the requirements of Document Jian Biao(2007)No.126 issued by Ministry of Construction(MOC)-Notice on Printing the Development and Revision Plan of National Engineering Construction Standards & Codes(Batch 2).

During preparing this Code,the team of preparing This code has conducted extensive investigation and analysis and carefully summarized the experience of design and production of metal mines of our country,and coordinated with the relative standards and codes and drawn experience from the relative standards and codes.The team also extensively solicited the opinions from various aspects including designing,scientific research institutes,colleges and universities and production companies.After many times discussion and repeatedly modification,this Code was reviewed and finalized.

This code comprises 11 chapters with main contents of general provisions,terms and symbol,basic requirements,mining geology,mining water control,rock mechanics,open pit mining,underground mining,mining machinery,shaft sinking and drifting,mining safety and environmental protection.

The provision(s)printed in bold type is(are)compulsory one(ones)and must be enforced strictly.

Ministry of housing and urban-rural development of the people's republic of china is in charge of the administration of this Code and the explanation of the compulsory provisions,China Metallurgical Construction Association is in charge of routine management,Northern Engineering & Technology Corporation,MCC is responsible for explaining the specific technical contents.All relevant organizations are kindly requested to sum up and accumulate your experience in actual practice during the process of implementing this code.The relevant opinions and advice,whenever necessary,can be posted or passed on to the managing teams of National Standard Code for Design of Metal Mine of Northern Engineering &Technology Corporation,MCC,the address of which is Tonghui Road 16,Dalian Economy & Technology Development Zone of Liaoning Province,with the post code of 116622,the fax of 0411-88036894,in order that the code can be modified and supplemented.

Chief Development Organization,Participating Development Organizations,Chief Drafting Staff and Chief Reviewing Staff of this code:

Chief Development Organization:

Northern Engineering & Technology Corporation,MCC

Participating Development Organizations:

Zhongye Changtian International Engineering Co.,Ltd.

Northern University

Institute of Rock and Soil Mechanics,Chinese Acadamy of Science

Branch Company of Meishan Metallurgy Development Co.,ltd.

Ruzhong Metallurgy Mining Co.,Ltd.

Pangang Group Mining Co.,Ltd.

Chief Drafting Staff:

Liu Zhaosheng Wang Shaoquan Liu Zhongwen Liu Changhai Yu Dianjiang

Jin Pizhen Jin Zhekui Tian Qinglin Guo Jie Liu Ruchen Ren Fengyu

Chen Guangfu Yu Haitao Li Xiaochun Han Bo Wu Ronggao

Zhang Wenzhe Liu Jianfeng Zhou Yu Wei Bingtuan Wang Litian

Wen Xiaolian Yu Tianliang Liu Haihong Jiang Shengwen Wu Huyong

Liu Benhong Zhu Xiaojie

Chief Reviewing Staff:

Wang Hongjun Zhang Chenjin Che Qun Yu Nanzhon Deng Xingliang

Yu Bin Zhang Xiangdong Wang Jun Zhangguang Xie Liang An Jianying

Wang Zhenping Xu Fengcai Zhu Bangzhou Luo Zhengshu Zhao Chuntao