8 Shaft Furnace Equipment Installation Engineering

8.1 Pin Roll Discharger

Ⅰ Major Item

8.1.1 Water pressure test must be carried with pipelines after installation of pin rolls and water-cooled beam.Water pressure test shall meet the requirements of design technical documents.Water pressure in the test shall be 1.5 times of work pressure in case of no requirement in design technical documents.Decrease test pressure to work pressure and stop press by 30 minutes after 10-minute constant test pressure.The installation is qualified if no pressure decrease and leakage checked.

Quantity checked:All.

Checking method:Check pressure test records and by observation.

Ⅱ General Items

8.1.2 Installation of hydraulic drive unit of pin roll discharger shall meet the requirements of current national standard GB 50387 Code for Installation Acceptance of Metal Mechanical HydromaticLubricating and Air-driven System Equipment.

Quantity checked:All.

Checking method:Check by observation.Check installation quality records.

8.1.3 Allowable deviation of pin roll discharger shall be in accordance with those specified in Table 8.1.3.

Quantity checked:All.

Checking method:Refer to Table 8.1.3.

Table 8.1.3 Allowable deviation of pin roll discharger installation(mm)