参考文献
[1] GB 50010—2010混凝土结构设计规范 [S].北京:中国建筑工业出版社,2010.
[2] JTJ 270—1998水运工程混凝土试验规程 [S].北京:人民交通出版社,1998.
[3] DNV-OS-J101(2011)Design of Offshore Wind Turbine Structures [S].Norway:Det Norsk Veritas,2011.
[4] DNV-OS-J101(2014)Design of Offshore Wind Turbine Structures [S].Norway:Det Norsk Veritas,2014.
[5] DNV-OS-C502(2012)Offshore Concrete Structures [S].Norway:Det Norsk Veritas,2012.
[6] Löhning T, Voβbeck M, Kelm M. Analysis of Grouted Connections for Offshore Wind Turbines [J].Proceedings of the ICE-Energy,2013,166(4):153-161.
[7] Sørensen E.Fatigue Life of High Performance Grout in Dry and Wet Environment for Wind Turbine Grouted Connections [J].Nordic Concrete Research,2011:1-10.
[8] Lamport W B, Jirsa J O, Yura J A. Grouted Pile-to-sleeve Connection Tests [C]//19th Off-shore Technology Conference, Houston, Texas.1987:27-30.
[9] Burrows R W, Kepler W F, Hurcomb D, et al.Three Simple Tests for Selecting Low-crack Cement [J].Cement and Concrete Composites,2004,26(5):509-519.
[10] Jensen O M, Hansen P F. A Dilatometer for Measuring Autogenous Deformation in Hardening Portland Cement Paste [J].Materials & Structures,1995,28(7):406-409.